CONTEXT DIAGRAM OF THE PROJECT
Meeting Purpose: To produce a context diagram for the bottle filling machine
Meeting Date: 31/3/2021 (Wednesday)
Meeting Time: 9 P.M
Meeting Location: MS Teams Platform
Meeting Facilitator: Mohamad Saifullah bin Zolkefly
Attendees: Muhammad Firdaus bin Khaled, Muhammad Nasir bin Aziz.
Decision Made:
1. Types of Actors involve
- For certain operations, there are several actors involved. The actor is basically a human being who is responsible for a specific task. In this project, there are 3 actors involve which consist of the operator, supervisor, and maintainer. All of these 3 actors performing their designated roles which been stated in their job description.
2. Types of Entities involve
- The entities consist of an object that involves in this project. These entities consist of mechanical parts such as the conveyor motor and water pump.
3. Context Diagram
Figure 1: Project context diagram.
Discussion:
Figure 1 shows the finalized version of the context diagram used in this project. The actors consist of the operator which responsible for bottle placement onto the conveyor, the maintainer which responsible for maintaining the machine in good condition, and the supervisor who is responsible for monitoring yield for documentation purposes. The energy source uses is electrical energy for operating the MCU, sensors, and other mechanical parts. For MCU operation, the required operating signal is coming from the IR sensors which are used to sense the bottle's presents and then being processed by the MCU to produce outputs process in form of controlling the conveyor motor and the water pump.
Conclusion:
In the conclusion, the outcome we get is able to finalize the project context diagram as well as gain our basic knowledge about producing the context diagram.
Updated by: Mohamad Saifullah bin Zolkefly